Honouliuli Wastewater Treatment Plant Secondary Treatment, Phase 1B
Ewa Beach, Oahu, Hawaii · Wastewater · 2025
Project details
Secondary treatment facility upgrades and Phase 1B expansions at the Honouliuli Wastewater Treatment Plant.

Always Digging Deeper
Yogi Kwong Engineers, LLC (YKE) is a Hawaii-based geotechnical engineering and construction management organization founded in April 2005 by David R. Yogi, Jr., P.E. and James K.P. Kwong, Ph.D., P.E. YKE has completed over 400 projects totaling nearly $7 billion in construction cost, including trenchless pipeline projects, dam rehabilitation, landslide mitigation, and large infrastructure work. YKE operates an AASHTO-accredited soils testing laboratory validated by the U.S. Army Corps of Engineers. Its drilling subsidiary, YK Drilling, LLC, provides geotechnical, environmental, and water well drilling services throughout Hawaii and the Pacific.
AASHTO Accredited Soils Testing Laboratory · U.S. Army Corps of Engineers Validated Laboratory
David R. Yogi, Jr.Co-Founder
James K.P. KwongCo-Founder
Comprehensive subsurface investigation, analysis, and hazard mitigation for major infrastructure, buildings, and specialized civil works.
Redefining possibilities in state-of-the-art trenchless pipeline, tunnel, and crossing design and analysis.
Geotechnical investigation, stability analysis, and repair design for dams.
Slope stability analysis, landslide investigation, and emergency mitigation planning.
Subsurface characterization and geologic hazard investigations to support structural design and risk management.
Professional construction engineering and management services for public works, utility, and infrastructure projects.
On-site engineering oversight and representation during construction phases.
Quality control, site observation, and contract compliance monitoring for infrastructure works.
AASHTO-accredited and U.S. Army Corps of Engineers-validated laboratory services providing rigorous testing of geological materials.
Unconsolidated-Undrained (TXUU) and Consolidated-Undrained (TXCU) testing for material shear strength analysis.
Specialized land and difficult-access exploration, sampling, and monitoring installations provided through YK Drilling, LLC.
Infrastructure · Water Supply · Wastewater · Transportation · Government
Ewa Beach, Oahu, Hawaii · Wastewater · 2025
Secondary treatment facility upgrades and Phase 1B expansions at the Honouliuli Wastewater Treatment Plant.
Kaneohe/Kailua, Oahu, Hawaii · Wastewater · 2019
A major wastewater conveyance tunnel project providing long-term system capacity and environmental protection.
Pearl Harbor, Oahu, Hawaii · Water Supply · 2020
Installation and replacement of a critical 24-inch underwater waterline crossing connecting Ford Island to Landing C.
Hilo, Hawaii Island, Hawaii · Infrastructure · 2015
Geotechnical stabilization and scarp protection measures to secure the stream bank at the Riverside Apartments.