Blue Creek Mine River Barge Load-Out Facility
Tuscaloosa, Alabama · Mining · 2025 · Client: Warrior Met Coal
Project details
Engineering, procurement, construction, start-up, and commissioning of a river barge load-out facility. The system features two truck unloading stations feeding a 42-inch-wide stacking conveyor at 500 TPH, reclaim hoppers with vibratory feeders, a concrete tunnel with safety escapes, and a 72-inch barge load-out conveyor feeding barges via a telescopic chute, all controlled by programmable logic controllers.