Regional Connector Transit Corridor
Los Angeles, CA · Transit · 2023 · Client: LA Metro
Project details
Underground light rail link through downtown Los Angeles connecting Metro Gold Line to Metro Blue and Expo Lines via Flower and 2nd Streets. ~1.9 miles of cut-and-cover and 21-ft diameter twin bored tunnels, three underground stations, and a SEM cavern. VNTU served as subconsultant to CPJV (AECOM and WSP) for design and construction submittal review. Opened June 2023.
