Sun River Connector Trail
Great Falls, MT · Bridges
Project details
Provided subsurface utility engineering as part of a team for a project adding 10 feet of width to the I-15 Sun River Bridge to establish a non-motorized community link. The scope entailed driving sheet piles for a reinforced concrete moment slab cantilevered over the sheet piles, earning an ACEC-Montana Small Projects Category Honor Award.
