19th Avenue Water Main Replacement
Water Supply
Project details
A water main replacement project utilizing pipe bursting trenchless technology.

Quality Trenchless Design, Risk Management and Specialty Inspection Services
Staheli Trenchless Consultants is a specialty engineering practice delivering quality trenchless design, risk management, and construction inspection services. Founded in 2007 in Lynnwood, Washington, it brings over 130 combined years of expertise across a wide range of trenchless technologies, including microtunneling, horizontal directional drilling, guided boring, auger boring, pipe ramming, pipe bursting, and EPB tunneling. It is highly active with NASTT and ISTT, contributing nationally and internationally recognized research and publications to advance the trenchless industry.
Kimberlie StaheliPresident & Principal Engineer
Provides comprehensive feasibility studies and design engineering for trenchless utility and pipeline infrastructure projects.
Expertise across multiple trenchless methods including microtunneling, horizontal directional drilling, guided boring, auger boring, pipe ramming, pipe bursting, EPB tunneling, and in-place rehabilitation.
Assesses project feasibility through the evaluation of geotechnical data and site conditions, risk identification, and recommendation of optimal trenchless methods.
Develops construction plans, authors technical specifications, prepares geotechnical baseline reports, performs risk assessments, and creates project schedules and cost estimates.
Conducts independent third party design reviews at various project stages from 30% to 90% completion to minimize construction risk and reduce project costs.
Delivers comprehensive pre-bid, post-construction, and on-site construction management services tailored for trenchless projects.
Develops and evaluates contractor pre-qualification packages and conducts quality assurance reviews to ensure qualified bidding contractors.
Provides full-time, on-site construction management to track contractor performance, verify specification compliance, and minimize active risks.
Provides contractor claim evaluations, expert witness testimony, and claims-related counseling.
Infrastructure · Water Supply · Wastewater · Oil & Gas · Tunnels
Water Supply
A water main replacement project utilizing pipe bursting trenchless technology.
Seattle, WA · Infrastructure
A risk evaluation project utilizing horizontal directional drilling (HDD) trenchless technology.
Water Supply
A water supply trenchless crossing project utilizing auger boring and guided auger boring.