Mill Creek Power Station Stormwater Management
Blacksburg, South Carolina · Power Generation · 2002 · Client: Duke Power
Project details
Site development, grading, erosion, and sediment control plans for a 140-acre power station site. Post-development design included open ditches, an underground storm sewer system, and two sedimentation/detention basins with outlet control structures providing over 500,000 cubic feet of storage each.