GE Gas Turbine Piping Relocation
Greenville, SC · Power Generation · Client: GE / Palmetto Engineering Inc.
Project details
Piping design for relocation of an existing bucket repair process from Houston, TX into a 28,000-square-foot warehouse at GE's Greenville facility. Over eighty pieces of equipment were relocated or repurposed. Scope included field verification and piping design for compressed air, process water, process cooling water, argon, nitrogen, oxygen, hydrogen, process drain, and exhaust distribution.