City Lake Dam Geotechnical Exploration
Tompkinsville, Kentucky · Water Supply
Project details
Subsurface exploration and analysis for City Lake Dam in Tompkinsville, Kentucky.

Engineering Solutions for Infrastructure, Utilities, and Development Projects
Precision Engineering is a multi-disciplined civil engineering practice founded in 2013. It provides civil engineering, geotechnical engineering, land surveying, materials testing, special inspections, and construction observation services to public and private clients across Kentucky and Tennessee.
Steve HarrisFounder
Seth EllisCivil Department Manager
Mark BillingsleySurveying Department Manager (Tompkinsville)
Bill CampbellSurveying Department Manager (Hindman)
Tucker EnglandCivil Project Manager & UAV Pilot
Chris MeyersMaterials Testing Laboratory Manager
Adam GreeneSpecial Inspections Manager
Lesley HarrisCFO
Ron JohnsonCivil Project Manager
Kelsey NixonProject Administration
Justin SmithProject Manager
Lance WilliamsProject Manager
for public infrastructure and private development, including planning, permitting, regulatory coordination, and construction-phase support.
Engineering services dedicated to public sector infrastructure improvements.
Design and analysis of water treatment, distribution, and wastewater collection and treatment facilities.
Comprehensive site planning, grading, drainage, and utility layout for development projects.
and subsurface investigations to support design, manage subsurface risk, and keep projects on schedule.
Soil borings and geological evaluations to determine soil suitability and foundation parameters.
Precise land surveying services leveraging advanced GPS and robotic surveying technologies.
Utilizing high-accuracy instrumentation to capture precise measurements.
Accurate mapping and identification of legal property boundaries.
Field staking and layouts to translate design plans to construction teams.
Post-construction surveys capturing exact built conditions for record.
Work in this area is organized into supported delivery tasks.
Support includes High-accuracy laboratory.
Support includes field testing for construction materials.
Support includes soil strength.
Support includes density.
Support includes classification results.
Support includes Work in this area is organized into supported delivery tasks.
Quality assurance testing and special inspections to ensure all structural and construction materials meet project specifications.
Code-mandated independent inspections of critical building components.
Field observation and monitoring to verify alignment with design parameters and construction schedules.
Commercial · Land Development · Education · Government · Water Supply · Wastewater · Infrastructure · Utilities · Parks & Open Space
Tompkinsville, Kentucky · Water Supply
Subsurface exploration and analysis for City Lake Dam in Tompkinsville, Kentucky.
Tompkinsville, Kentucky · Commercial · Client: Cleary Construction
Civil site development and inspection services for the Cleary Construction maintenance facility.
Shelbyville, Kentucky · Commercial · Client: Caliber Collision
Development engineering and site support for the Caliber Collision facility in Shelbyville, Kentucky.
McCreary County, Kentucky · Education
Civil design, surveying, and engineering support for McCreary County Middle School.