Big Foot
Gulf of Mexico · Oil & Gas
Project details
FPS personnel provided concept screening and concept studies of dry tree solutions for this deep water development in the Gulf of Mexico in 5,187 feet of water, with an ETLP selected as the optimum floating production system. The work included detailed design of the hull and mooring system.