City Tunnel No. 3
New York, NY · Tunnels · Client: Grow-Perini-Skanska, AJV
Project details
Provided consulting services during the second construction stage of City Tunnel No. 3, which was designed to bypass two existing historic tunnels. Deliverables included structural design of the tunnel bulkhead to withstand 900 feet of hydrostatic head, engineering of underground electrical and ventilation vaults, evaluation of support systems for down-drilled shafts, and concrete lining strength reports.
