Tappan Zee Bridge Leveling Control System
Hudson River, NY · Bridges · 2013 · Client: Governor Mario M. Cuomo Bridge Project
Project details
Designed, developed, and implemented a state-of-the-art leveling control system to manage bridge span motion during construction of the twin cable-stayed bridge over New York's Hudson River. The system was mounted on the Left Coast Lifter, a floating derrick barge used to assemble bridge components.
