Bayou Pierre Responsible Mitigation Plan
Stormwater & Flood Control
Project details
Hydrologic engineering and existing conditions analysis for a wetlands mitigation bank to support permitting with the U.S. Army Corps of Engineers (USACE). Work included the investigation of site soils, existing hydrologic infrastructure, connectivity with adjacent waterways, and evaluation of stream gauge and rainfall data.
