DC Water Sewer System Evaluation Study (SSES) - Phase I Nicholson Street Area
Washington, DC · Wastewater · Client: DC Water
Project details
Executed closed-circuit television (CCTV) inspections on sewer pipes ranging from 8 to 12 inches to identify cross-connections and water ingress points. Arthur Engineering Services performed comprehensive manhole inspections, implemented flow monitoring in strategic locations to detect high flow rates, and used smoke and dye-water testing to isolate stormwater entry points.
