I-35 NEX South Project Electric and Telecom Utility Relocations
San Antonio, TX · Utilities
Project details
Relocation design of approximately 5,000 feet of telecommunications duct banks and 4,000 feet of electrical duct banks within TxDOT Right-of-Way. Included alignment and utility construction drawings for underground dry utility relocations by open cut, horizontal directional drilling (HDD) bore, and conventional bores under I-35 and I-410.