Public Utility District Modernization
Water Supply · Client: Public Utility District
Project details
A multi-phase initiative to modernize a local water utility and ensure long-term reliability. Upgrades included replacing a 230,000-gallon bolted steel tank with a new 220,000-gallon welded steel tank, executing slope stabilization, and installing altitude and control valves. The project also featured a new 720-square-foot booster pump station equipped with variable frequency drive (VFD) pumps, a 55kW backup generator, and upgraded SCADA systems, as well as drilling a 350-foot production well and implementing remote-read smart meters.